§ 19.30.020. Conditions required for permit and site approval.  


Latest version.
  • The applicant shall set forth in detail, on forms provided by the commission, the reasons for the requested conditional use permit citing that the intended use is authorized by this chapter. The commission may approve a request, provided the commission makes a finding that all of the following conditions exist:

    (1)

    That the use applied for at the location set forth in the application is properly one for which a conditional use permit is authorized by this title.

    (2)

    That the use is necessary or desirable for the development of the community and is not detrimental to existing uses or uses specifically permitted in the district classification as per this title.

    (3)

    That the site for the intended use is adequate in size and shape to accommodate the use and that all of the yards, setbacks, walls or fences, landscaping, and other features required in order to adjust the use to existing uses or possible future uses on adjoining land in the neighborhood be compatible with one another.

    (4)

    That the site for the proposed use conforms to streets and highways properly designed and improved so as to carry the type and quantity of traffic generated or to be generated by the proposed use.

    (5)

    City sewer service shall not be provided to any parcel not meeting the requirements of this chapter.

(Ord. No. 934-2015, § 19.30.020, 7-20-2015)